Directors Update – 26.07.2022

Date of meeting 29.06.2022

We considered a quote for jet washing the Park. It was only for the paving stones on paths, not drive ways or tarmacked areas. We all agreed £8,000 was too much money and asked for more quotes.

The gutters have now been cleared and members would have seen the ‘cherry picker’ machine on site. Assessment was made of gutter repairs, missing slates, growing plants and re-pointing. Quotes for these have now been received and will be considered this week. It is difficult to do both jobs at once because the contractor doesn’t know what they are going to find and/or which equipment and tools they need with them in the confined space of the basket on the picker. We will see if anything can be done differently on the next rotation in 2 years time.

Quotes have been received for replacing broken paving slabs to commence after all the repairs to the gutters and rooves has been completed.

There is damp in one of the stair wells in St. Edwards Hall. Gaining access to apartments to examine and repair has proved difficult but is still being pursued.

The starting of the external painting is taking longer than we would all like. It should have started at the beginning of the year but with the change of management board, the contractor took on other work to fill the gap in his diary. We should have more about this this week as our next meeting is 29.7.2022.

Garden Contractor – we met with them earlier this month and they advised a gardener was joining the team to tackle all the smaller items on the estate e.g. weeding, pruning etc. This is starting to make a real difference. The query over Wall Lane Terrace has still not been resolved.

Website additions continue to be made: www.stedwardspark.org . Further suggestions for additional pages were: historical information about the hospital, downloads of formal documentation/ members area, woodland and nature spotting blog where members and their family can record and share nature sightings. This will also help form a record of wildlife on the Park to help with the grant received for the woodland area. With the paperwork available to us, we believe the matters in relation to the previous grant over 5 years were met and work carried out. The existing grant is paid annually 2021-2025. A few of the directors are starting to work with this and the grant maker with a view to determining exactly what is required, record wildlife species, establish a bird watching area, put up bird boxes in the autumn. We may be looking for some help with this from members.

Summer-Houses – It was noted that the council meeting on 26 July 2022 was to consider the grant, CM confirmed that the regeneration officer required no further information.
To enable the surveyors to complete their report, a builder would be needed to confirm the roof construction of the summerhouses, as they were all different. The roof would need to be peeled back and tiles take down baseboards from the eaves. It was agreed that a quote to repair the first summerhouse would be sought to determine
whether to proceed regardless, this was approved unanimously.
It was also agreed that a display board showing the history of St Edwards Park in the first summer-house would be a useful addition.

Date of next meeting: 29th July 2022.

Directors Update – 24.6.22

In this Directors Update we would like to tell you that we now have a website up and running: www.stedwardspark.org . There will still be features to add but we wanted to have a place where all Members can see our updates on information about the Park. It is also a place where we can celebrate our home too. Please have a look.

By now, you should have received the minutes of the General Meeting by email, or will receive them shortly by post.

Next Directors Meeting

We have our next Directors meeting this Friday, 1st July. (For those who are just finding this website and don’t do Facebook, the other posts on here are a summary of that meeting).

After next weeks meeting, we will again update here on the website, on Facebook and will arrange for emails or letters to reach all Members so they know about the new website together with an matters discussed. We will also provide further clarity on the Members questions that have been raised.

Right Light, Right Time, Right Place

After a resident shared a photo of the clock tower with only a couple of faces illuminated (and the time only correct once a year), LSS Electrical Ltd were instructed to take a look at the clock. Access to the tower was through a loft hatch in one of the apartments in St Edwards Hall. The engineer, James, reports that it was ‘remarkable to see the clock mechanism and very exciting’.

The time hadn’t been set on the clock for a few years so he was able to set about repairing this too whilst up there. He checked and lubricated the clock mechanism and set the time on the master clock, clock faces and set the automatic timer to British Summer Time. After looking at the illumination of the clock faces he found poor contact to the batten lamps. All 8 batten lamps and condensers were then replaced and voila – let there be light!

Clock Tower Repairs Outside, V Salt

Directors Update – Maintenance

Play Parks – Castle have been trying to source the replacement parts for each park and they should be available in June. UPDATE: source found, awaiting delivery – 15 June 2022.

Garden Plus – the 12 month contract was started in April. The Board are now liaising monthly with Garden Plus to agree priorities. Grass, hedges and shrubs last fortnight. The next visit will cover grass and weed spraying. Let block@castle-estates.co.uk know if there are any areas that are being missed – please be friendly to the staff on the ground. UPDATE: 14.6.22

All – we have good news and bad news – the bad news is due to Garden Plus hitting a large metal spike that has been buried at grass height they are unable to continue with the bulk of the mowing because it has caused serious damage to their ride-on mower .

They will, however, continue to mow as much as possible with the smaller mowers. The good news – Dave has confirmed he will be spraying the paths tomorrow (15.6.22) to start killing the weeds and all other issues raised have been discussed and hopefully you all should start seeing some progress in the coming weeks/months. We are closely monitoring all the work conducted by Garden Plus and will be working with them to ensure everything is covered.

Wall Lane terrace and the path behind Willow Drive is still in discussion and will be dealt with as soon as possible. We thank you all for your patience on this we are all trying our best to resolve the issues raised. Many Thanks

Door Entry Systems – these are still being changed over and you should have had a letter from Castle to tell you your block date and new codes (for security reasons). UPDATE: These have mostly been completed bar 2 blocks.

Summer Houses – Chris and Suzanne met with a surveyor and builder on the 31st May to evaluate the work needed doing.